Construction of a Manufacturing Facility
Worthing
Project Overview
Rundown Factory Unit Requiring Extensive Refurbishment
Our client’s objective was to transform this rundown, old factory unit to extend its world class manufacturing facility. This would include another production line, research and development offices, temperature controlled rooms to calibrate equipment, as well as management offices.
Construction of a Second Floor to Maximise Space
To provide our client with the space they required and to maximise the space available in the unit, we not only had to construct on the ground floor, we also had to extend up within the unit to construct a first floor. The factory unit was situated on poor ground as it was close to a stream. Through a careful process with the structural engineer, the foundations were designed and installed to allow for the first floor construction. The other challenge was speed. Our client desperately needed the facility to accommodate the growing demand.
Large Roof Lights and Eco-Friendly Air Conditioning
“
“
Peter
Worthing
Manufacturing Facility Construction
Call Us
Visit Us
5 St Johns Parade, Alinora Crescent, Goring-by-Sea, West Sussex, BN12 4HJ